Type
Transports
Local
Mozambique
State
Finished
Year
2016
Client
ODEBRECHT
- The Maputo Urban Mobility Project consists of a BRT (Bus Rapid Transit) line of Phase 1 between Praça dos Trabalhadores and Magoanine, supplemented by a secondary line that ends at the Museum of Natural History. The total length is 16.5 km. The route is integrated with existing avenues and includes 16 stations, 4 terminals and 1 parking and maintenance garage. To be implemented on a large scale across the city, the BRT project is key for improving urban mobility and is intended to contribute significantly to the decongestion of the main arterial roads.
- Coordination and execution of the preliminary design, basic design and detailed design, covering all fields of expertise involved in the construction of buildings and infrastructure associated with roads, stations, terminals and garage.