Type
Indústria e Energia
Local
Portugal
State
Finished
Year
2020-2021
Client
Siemens Energy
The Sincelo wind farm consists of two 50MW wind sub-farms, called Argomil Mouro and Galo Rainha Wind Farms. QUADRANTE was responsible for developing the engineering projects for the two 60/20kV lift substations of the Argomil Mouro and Galo Rainha wind farms, and for the 220/60kV Sincelo concentrating substation, which will allow connecting this power-generating centre to the Public Service Electricity Grid (RESP).
The construction of the Wind Farm is part of a series of investments by EDP Renováveis that contributes to increasing the capacity to generate electricity through renewable energy sources, thus reducing dependence on fossil fuels.
QUADRANTE was responsible for coordinating, managing and preparing the Electrical and Electromechanical, Civil Construction, and Metallic Structures Projects.