Type
Aeroport
Local
Ghana
State
In Construction
Year
2019
Client
QG CONSTRUCTION UK
The Tamale Airport Phase 2, Upgrade and Expansion Project, consists of the development of both a Passenger Main Terminal and a Multi-Purpose Terminal, as well as all the associated landside facilities and infrastructures, such as roads, car parks, curbside, water treatment plant and electrical substation. The Main Terminal has an area of around 5 000 m2 and has been designed for a peak hour of 400 passengers, handling both international and national flights. Project financed by the United Kingdom Export Finance (UK EF).
QUADRANTE is responsible for all design stages, for all the above-mentioned engineering disciplines. Architectural designs developed by QUADRANTE in collaboration with MM Concept. The Project was developed in BIM in an integrated and coordinated manner.