Type
Industry and Energy
Local
Portugal
State
Finished
Year
2009
Client
SIEMENS / ELECGAS, SA
- This project consisted in the installation of two new electricity generation units built in an area of 60,000 m2 with a capacity of 800 MW. The industrial process included the use of water heating during gas burning to obtain a second burning of the water steam in a single turbine. The main components are: Turbine building, boiler room and cooling towers.
- Participation in the construction project of two new electricity generation lines at the Pego Combined Cycle Power Station (gas-steam). The scope of participation included the review of structural design, safety project, acoustic conditioning and environmental protection study in partnership with SIEMENS Austria. In this process the company worked as a local engineering team for SIEMENS within the scope of the projects.